Key Features:
- Demolition of 4 nos. existing Carbon Steel Potable water Tanks (PWT) Nos . 730-S-002 A/B/C/D, foundation and associated CS piping in brownfield running project site.
- Construction of 4 Nos. of new GRP rectangular panel Tanks to replace the existing CS tanks