7,000 m3/day SWRO Desalination Plant and Water Treatment Plant (WTP) package for 1X525 MW SEPC Tuticorin Thermal Power Project , Stage-IV at Thoothukudi, India

Project Information

  • 7,000 m3/day SWRO Desalination Plant and Water Treatment Plant (WTP) package for 1X525 MW SEPC Tuticorin Thermal Power Project , Stage-IV at Thoothukudi, IndiaContract / Project Name
  • Megha Engineering & Infrastructure Ltd. Balanagar, Hyderabad, Telangana, IndiaClient:
  • Hyderabad, IndiaLocation:
  • 3044/MEILProject No:

Project Description

Key Features:

  • 7,000 m3/day SWRO Desalination Plant
  • Mixed Bed system for Demineralization - 64 m3/hr per MB unit
  • Key components include Pretreatment system, DMF, Ultrafiltration system, SWRO system, BWRO, ETP, etc
  • Buildings and Electromechanical Works, Electrical and Instrumentation Control & Automation Work
  • Substation works