Key Features:
- Construction of New pump station (Unit V) to transmit the flow to Shobaisi PS with a capacity of 16.63 MIGD and to deliver including the standby units, 24 MIGD to Shobaisi pumping station during emergencies.
- New 5 MIG tank with two compartments at Unit V pump station
- New DN1000 mm pipeline connecting the Unit V PS with the existing DN1000 transmission pipeline going to Shobaisi PS.