Twin DN 1600 CS Pipeline from Tap Off -12 to Al Ain Reception Center

Our Scope:


EPC Scope includes obtaining necessary clearances from various authorities, basic engineering, designing, preparation of shop drawings, technical submittal & obtain approvals for all materials, equipments & designing, procurement & supply, shop fabrication, factory testing, conducting client approved third party/consultant approvals, transportation to site, storing, handling, delivery, Construction, Erection, Installation, testing, commissioning, preparation of "As Build Drawings", project record books & manuals, supply of spares & taking the system into O&M & handing over of fully operation plant of
















- Water transmission PE coated and Cement lined Carbon Steel twin pipeline of API 5L Grade of DN 1600 Dia of 54 KMs from Fujairah Tap off -12 to Al Ain Reception Center .

- Water and Sewerage Networks

- 12 Nos. of drain stations, 7 Nos. of manual vent stations and 6 Nos. of automatic vent stations.  

- One tap off station, 2 x Tie-Ins and one valve station.

- Non Destructive Road Crossings

- FOC pipeline cables along the pipeline length

- Cathodic Protection for steel pipeline

- Civil construction and camps

- Providing Utilities services to Reception Center  


Location

Al Ain / UAE


Customer

Abu Dhabi Transmission & Despatch Company - TRANSCO