Replacement of existing water distribution network in Abu Dhabi Island for Sectors E09_02, E10, E13 and W14_02

Our Scope:


Replacement of existing water distribution network in Abu Dhabi Island for Sectors E09_02, E10, E13 and W14_02.4


- Supply and installation of new pipelines of approximately 18.0 Km with all associated valves, fittings, Flow meters, control valves and equipments for sectors E9-02, E10&E13 in Abu Dhabi island.


1. Replacement of existing DI pipeline of DN 150mm with new HDPE Pipeline of DN 160 mm – 7.60 KM


2. Replacement of existing DI pipeline of DN 200mm with new HDPE Pipeline of DN 200 mm – 5.483 KM


3. Replacement of existing DI pipeline of DN 250mm with new HDPE Pipeline of DN 250 mm – 0.523 KM


4. Replacement of existing DI pipeline of DN 300mm with new HDPE Pipeline of DN 315 mm – 3.0 KM


5. Construction of new HDPE pipelines of DN 110 mm – 1.3 KM


- Exhumation of the existing water distribution network to be replaced and Transportation of exhumed materials to designated ADDC store or to a Municipality approved dump site or to other designated area.


- All necessary connections to the new pipelines from the existing water network.


- Construction of civil works including necessary valve chambers, washout chambers, air valve chambers, flow meter chambers, flow control valve chambers, fire hydrants, thrust blocks, protection slab, road crossings etc. with all associated works wherever required all as per ADWEA /ADDC Specifications.



Location

Abu Dhabi / UAE


Customer

Abu Dhabi Distribution Company - ADDC